Periscopix

Sector

Marketing

Location

London,SE1

Year

2019

Size

28,000 sq/ft

Timeframe

8 Weeks

The Project overview

  • 2 floors
  • 750 Cat 6 outlets 
  • 1 Communications room
​
Background
 

Following ServiceIT Networking's successful appointment as the structured cabling contractor.

 

An  internal fitout across the two floors was to be caried out and our responsibility was to provide the horizontal cabling to the required design and specification.

merk3.jpg
merk4.jpg
The Solution

​

Owing to the design of the building the installation of all the cabling was carried out a high level.  With an excellent main contractor and outstanding electrical contractor completing all the high level containment of which there were 1,000's of meters we were able to carry out the works within the timescales set and offer full manufacturers certification. 

​

We have been back several times over the years for changes and additions. 

​